{"id":3925,"date":"2023-11-09T16:44:00","date_gmt":"2023-11-09T15:44:00","guid":{"rendered":"https:\/\/www.pyrum.net\/?p=3925"},"modified":"2025-09-10T08:21:13","modified_gmt":"2025-09-10T06:21:13","slug":"pyrum-innovations-ag-first-pyrolysis-oil-produced-in-a-new-reactor","status":"publish","type":"post","link":"https:\/\/www.pyrum.net\/en\/corporate-news\/pyrum-innovations-ag-erstes-pyrolyseoel-in-neuem-reaktor-produziert\/","title":{"rendered":"Pyrum Innovations AG: First pyrolysis oil produced in new reactor"},"content":{"rendered":"<ul>\n<li>Reactor ramped up to target temperature under production conditions for the first&nbsp;time<\/li>\n<li>All circuits run as planned in terms of process engineering<\/li>\n<li>Longer test production run of the reactor planned until the end of the&nbsp;year<\/li>\n<\/ul>\n<p>Dillingen \/\u200bSaar, 9&nbsp;November 2023 \u2013 Pyrum Innovations AG (\u201cPyrum\u201d, the \u201cCompany\u201d, ISIN: DE000A2G8ZX8), a&nbsp;pioneering company that sustainably recycles used tyres with its globally patented, unique pyrolysis technology, announces the first successful warm-\u200bup of the new Reactor 2&nbsp;at its main plant in Dillingen\/\u200bSaar. In this context, the reactor was started up and heated to the production temperature of around 650 \u00b0C for the first time, fed with granulate and the dosing system successfully tested so that the first pyrolysis oil could be produced in small quantities.<\/p>\n<p>Pascal Klein, CEO of Pyrum Innovations AG: \u201cIn the course of the warm commissioning that started at the end of October, we can announce the next success story. The first warm-\u200bup was completed as planned and all systems and circuits worked as intended. We will now analyse the findings and incorporate them into the further warm commissioning. After a&nbsp;further test run in around two weeks\u2019 time, we plan to carry out the first longer test production run of the reactor in December and produce pyrolysis oil continuously. Reactor 3&nbsp;is to follow shortly afterwards.\u201d<\/p>\n<p>After the initial warm-\u200bup, the reactor was shut down again in a&nbsp;controlled manner. After the start of continuous test operation, the throughput of the first new line will be successively ramped up to 75 %. All the experience gained from line 2&nbsp;will then be transferred to line 3&nbsp;and line 3&nbsp;will also be ramped up to a&nbsp;throughput of 75 % as quickly as possible. Both lines are then gradually ramped up to 100 %. The entire process up to full capacity utilisation is carried out as quickly as possible, but can take several months, as is usual for plants of this&nbsp;size.<\/p>","protected":false},"excerpt":{"rendered":"<p>Pyrolysis oil successfully produced in new reactor 2&nbsp;in Dillingen. Systems work according to plan. Longer test operation to follow.&nbsp;<\/p>","protected":false},"author":1,"featured_media":6269,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"wp_typography_post_enhancements_disabled":false,"footnotes":""},"categories":[21],"tags":[],"beitragskontakt":[33],"class_list":["post-3925","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-corporate-news","beitragskontakt-ir-on-ag-frederic-hilke"],"_links":{"self":[{"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/posts\/3925","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/comments?post=3925"}],"version-history":[{"count":0,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/posts\/3925\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/media\/6269"}],"wp:attachment":[{"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/media?parent=3925"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/categories?post=3925"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/tags?post=3925"},{"taxonomy":"beitragskontakt","embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/beitragskontakt?post=3925"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}