{"id":4309,"date":"2024-02-21T08:00:16","date_gmt":"2024-02-21T07:00:16","guid":{"rendered":"https:\/\/www.pyrum.net\/?p=4309"},"modified":"2025-09-09T17:10:13","modified_gmt":"2025-09-09T15:10:13","slug":"pyrum-innovations-ag-reaches-next-milestone-first-oil-delivery-from-the-new-plant-on-the-way-to-basf","status":"publish","type":"post","link":"https:\/\/www.pyrum.net\/en\/corporate-news\/pyrum-innovations-ag-erreicht-naechsten-meilenstein-erste-oellieferung-aus-der-neuen-anlage-auf-dem-weg-zur-basf\/","title":{"rendered":"Pyrum Innovations AG reaches next milestone: First oil delivery from the new plant on its way to&nbsp;BASF"},"content":{"rendered":"<ul>\n<li>Positive sampling \u2013 pyrolysis oil from the new plant fulfils all required specifications<\/li>\n<li>First oil delivery from new reactor 2&nbsp;in Dillingen is delivered to&nbsp;BASF<\/li>\n<li>Next commissioning run with focus on in-\u200bhouse power generation from pyrolysis gas planned within the next two&nbsp;weeks<\/li>\n<\/ul>\n<p><em>Dillingen \/\u200bSaar, 21 February 2024<\/em> Pyrum Innovations AG (\u201cPyrum\u201d, the \u201cCompany\u201d, ISIN: DE000A2G8ZX8), a&nbsp;pioneer in the sustainable recycling of end-\u200bof-\u200blife tyres (ELT) based on its patented pyrolysis technology, has reached a&nbsp;new milestone with reactor 2 (TAD 2) of the new plant at its main site in Dillingen\/\u200bSaar. In the course of the third commissioning run of TAD 2, the first truck with a&nbsp;delivery volume of around 24,000 litres of pyrolysis oil will be sent to BASF this morning. Following the last test run, the pyrolysis oil was carefully tested to ensure that it met all the required specifications. The sampling of the oil was successful, so delivery to BASF can proceed as planned and there are no more obstacles to future deliveries. Around 60,000 litres of oil have already been produced at the new plant and further deliveries are expected in the near future.<\/p>\n<p>Pascal Klein, CEO of Pyrum Innovations AG: \u201cThe result speaks for itself. After three weeks of continuous production, we have reached a&nbsp;new milestone with the first delivery of our pyrolysis oil from TAD 2&nbsp;to BASF. We are very proud to have achieved this ahead of schedule, which is largely due to the dedication of our team. We are now in a&nbsp;successful phase of our roll-\u200bout plan and are now preparing for our new intermediate goals \u2013 the in-\u200bhouse generation of electricity from TAD 2&nbsp;and the first test run of TAD&nbsp;3.\u201d<\/p>\n<p>Reactor 2&nbsp;is now in the thermal cleaning phase before being completely shut down for further testing. The next operational run is planned within the next two weeks as part of the start of self-\u200bgeneration of electricity from the pyrolysis gas in the turbines.<\/p>\n<p>The lessons learned from the TAD 2&nbsp;test runs are now being applied to the third reactor in Dillingen. Preparations for the first test run should be completed by the end of March, with the aim of rapidly ramping up this reactor to 80% of its nominal capacity. The new plant will triple the previous production capacity.<\/p>","protected":false},"excerpt":{"rendered":"<p>Pyrum delivers first pyrolysis oil from reactor 2&nbsp;to BASF. 24,000 litres from Dillingen. New milestone in the rollout plan.<\/p>","protected":false},"author":1,"featured_media":4323,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"wp_typography_post_enhancements_disabled":false,"footnotes":""},"categories":[21],"tags":[],"beitragskontakt":[33],"class_list":["post-4309","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-corporate-news","beitragskontakt-ir-on-ag-frederic-hilke"],"_links":{"self":[{"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/posts\/4309","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/comments?post=4309"}],"version-history":[{"count":0,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/posts\/4309\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/media\/4323"}],"wp:attachment":[{"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/media?parent=4309"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/categories?post=4309"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/tags?post=4309"},{"taxonomy":"beitragskontakt","embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/beitragskontakt?post=4309"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}