{"id":6218,"date":"2024-08-28T10:15:54","date_gmt":"2024-08-28T08:15:54","guid":{"rendered":"https:\/\/www.pyrum.net\/?p=6218"},"modified":"2025-09-10T08:35:43","modified_gmt":"2025-09-10T06:35:43","slug":"pyrum-innovations-ag-commissioning-of-tad-2-and-3-at-the-main-plant-in-dillingen-saar-is-progressing-according-to-plan","status":"publish","type":"post","link":"https:\/\/www.pyrum.net\/en\/corporate-news\/pyrum-innovations-ag-inbetriebnahme-von-tad-2-und-3-am-stammwerk-in-dillingen-saar-schreitet-plangemaess-voran\/","title":{"rendered":"Pyrum Innovations AG: Commissioning of TAD 2&nbsp;and 3&nbsp;at the main plant in Dillingen\/\u200bSaar is progressing according to&nbsp;plan"},"content":{"rendered":"<ul>\n<li>Third commissioning run of TAD 3&nbsp;successfully completed<\/li>\n<li>Optimisation work running according to&nbsp;plan<\/li>\n<li>100% performance tests on TAD 2&nbsp;and 3&nbsp;will be carried out shortly<strong><br>\n<\/strong><\/li>\n<\/ul>\n<p><em>Dillingen \/\u200bSaar, <\/em><em>28 August 2024<\/em> Pascal Klein, CEO of Pyrum Innovations AG: \u201cBoth systems are running so well that we are now focussing on the 100% performance test of TAD 2&nbsp;and TAD 3. We are very satisfied and proud of our entire team, which is doing an exceptional job. We have learnt a&nbsp;lot over the last eight months, so that we can look to the future with confidence and better plan and therefore shorten future start-\u200bups. At this point, it is important to mention once again that during commissioning of this kind, all system components are gradually pushed to their limits before they run at 100% together. This ensures the safety of our employees and our systems. It is not unusual for short periods of smoke, vapour and odours to occur. The incidents that have occurred in this context so far, which can usually occur during the commissioning of an industrial plant, have all been harmless and have proven the correct functioning of our safety systems.\u201d<\/p>\n<p>Pascal Klein, CEO of Pyrum Innovations AG: \u201cBoth systems are running so well that we are now focussing on the 100 % performance test of TAD 2&nbsp;and TAD 3. We are very pleased and proud of our entire team, who are doing an exceptional job. We have learnt a&nbsp;great deal over the last eight months, so that we can look to the future with confidence and better plan and therefore shorten future start-\u200bups. At this point, it is important to mention once again that during commissioning of this kind, all system components are gradually pushed to their limits before they run together at 100 %. This is for the safety of our employees and our systems. It is not unusual for short periods of smoke, vapour and odours to occur. The incidents that have occurred in this context so far, which can usually occur during the commissioning of an industrial plant, have all been harmless and have proven that our safety systems are functioning correctly.\u201d<\/p>\n<p>Interested shareholders will soon receive further information on the expansion of the main plant in Dillingen\/\u200bSaar and the new plant in Perl\/\u200bBesch in Pyrum Innovations AG\u2019s investor newsletter. The newsletter can be subscribed to at <a href=\"https:\/\/www.pyrum.net\/en\/investors\/e-contact\/#newsletter\">IR contact<\/a> .<\/p>","protected":false},"excerpt":{"rendered":"<p>Commissioning of TAD 2 &amp;&nbsp;3 in Dillingen is progressing. TAD 3&nbsp;at 70% rated power. 100% performance tests to follow.&nbsp;<\/p>","protected":false},"author":1,"featured_media":6268,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"wp_typography_post_enhancements_disabled":false,"footnotes":""},"categories":[21],"tags":[],"beitragskontakt":[33],"class_list":["post-6218","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-corporate-news","beitragskontakt-ir-on-ag-frederic-hilke"],"_links":{"self":[{"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/posts\/6218","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/comments?post=6218"}],"version-history":[{"count":0,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/posts\/6218\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/media\/6268"}],"wp:attachment":[{"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/media?parent=6218"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/categories?post=6218"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/tags?post=6218"},{"taxonomy":"beitragskontakt","embeddable":true,"href":"https:\/\/www.pyrum.net\/en\/wp-json\/wp\/v2\/beitragskontakt?post=6218"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}